Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Jurnal Rekayasa dan Manajemen Sistem Industri
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Team
Privacy Statement
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 3 No. 8 (2015)
Vol. 3 No. 8 (2015)
Published:
2015-08-26
Articles
ANALISIS PRODUKTIVITAS MENGGUNAKAN MODEL OBJECTIVE MATRIX (OMAX) DENGAN PENERAPAN MANAJEMEN RISIKO PADA PERBAIKAN (Studi Kasus: PT Tembakau Djajasakti Sari, Malang)
Muhammad Iqbal Farabi, Mochamad Choiri, Rahmi Yuniarti
p1560-1571
OPTIMASI PASOKAN TEBU PADA PG. LESTARI MENGGUNAKAN LINEAR PROGRAMMING DAN FUZZY LOGIC (Studi Kasus: PG. Lestari Kertosono, PTPN X)
Hastawati Chrisna Suroso, Purnomo Budi Santoso, Sugiono Sugiono
p1572-1582
PERANCANGAN TATA LETAK PENEMPATAN BARANG PADA GUDANG PENYIMPANAN PRODUK JADI MELALUI PENERAPAN STORAGE POLICY (Studi Kasus: Gudang Produk Jadi Pakisaji PT. Greenfields Indonesia – Malang)
Nikita Ashardika Putri, Ishardita Pambudi Tama, Debrina Puspita Andriani
p1583-1594
PENERAPAN METODE SIX SIGMA SEBAGAI UPAYA MEMINIMASI DEFECT PADA PRODUKSI ROKOK SKM (Studi Kasus: PT Tembakau Djajasakti Sari, Malang)
Rachmad Wahyu Irawan, Nasir Widha Setyanto, Rakhmat Himawan
p1595-1605
ANALISA RISIKO ERGONOMI PADA PROSES PRODUKSI PERALATAN KEBERSIHAN DENGAN METODE RELATIVE STRESS INDEX (Studi Kasus: UD Wartono Malang)
Bidenisa Yulfarida Siswoyo, Ishardita Pambudi Tama, Dewi Hardiningtyas
p1606-1615
MINIMASI WASTE UNTUK MENINGKATKAN PRODUKSI ROKOK SIGARET KRETEK TANGAN DENGAN VALUE STREAM MAPPING (Studi Kasus: PR. Adi Bungsu)
Christofhorus Sugiharto, Mochamad Choiri, Ihwan Hamdala
p1616-1627
ANALISIS BIAYA PADA BAGIAN REWORK PRODUK FURNITURE DAN PENGURANGAN REWORK BERDASARKAN FAULT TREE ANALYSIS (FTA) (Studi Kasus: PT. ROMI VIOLETA Sidoarjo)
Aliffia Yanuarrizki Yulianto, Nasir Widha Setyanto, Rakhmat Himawan
p1628-1639
PERENCANAAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN FIXED ORDER QUANTITY (FOQ) UNTUK MEMENUHI PERMINTAAN PUPUK (Studi Kasus di PT. Petrokimia Gresik)
Muhammad Hisyam Fayrus, Nasir Widha Setyanto, Rahmi Yuniarti
p1640-1651
IMPLEMENTASI BIAYA KUALITAS DENGAN METODE ACTIVITY BASED COSTING UNTUK MENGETAHUI PELUANG PERBAIKAN KUALITAS GULA (Studi Kasus: PG Tjoekir Jombang)
Halida Dwi Kusumawardhani, Nasir Widha Setyanto, Wifqi Azlia
p1652--1661
PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE II UNTUK MENENTUKAN KEBIJAKAN PERAWATAN YANG OPTIMAL PADA FORKLIFT (Studi Kasus di PT. Industri Kereta Api, Madiun)
Andika Purnama Putra, Arif Rahman, Rakhmat Himawan
p1662-1673
GREEN SUPPLIER SELECTION DENGAN INTEGRASI METODE ANALYTIC HIERARCHY PROCESS (AHP) DAN TOPSIS
Izdihar Dian Pawestri, Nasir Widha Setyanto, Ratih Ardia Sari
p1674-1685
PENENTUAN JUMLAH OPERATOR OPTIMAL PADA PENGALENGAN JAMUR DENGAN STOPWATCH TIME STUDY DAN WORKLOAD ANALYSIS (Studi Kasus: PT Eka Timur Raya)
Borisxa Masagha Pakpahan, Ishardita Pambudi Tama, Debrina Puspita Andriani
p1686-1695
PENGUKURAN KINERJA PERUSAHAAN DENGAN PENDEKATAN GREEN SUPPLY CHAIN OPERATIONS REFERENCE (GSCOR) (Studi Kasus: PR X)
Rohmatika Qoyum, Yeni Sumantri, Rahmi Yuniarti
p1696-1707
KOMPARASI METODE HEURISTIK UNTUK MENGOPTIMALKAN RUTE PENGIRIMAN PUPUK UREA (Studi Kasus: CV. LESTARI MULYO, Kediri)
Faizal Amirul Fat, Yeni Sumantri, Ratih Ardia Sari
p1708-1718
ANALISIS PERBAIKAN PADA WORKSTATION EDGING DENGAN MENGGUNAKAN METODE CREAM
Bagus Satriyo, Ishardita Pambudi Tama, Lely Riawati
p1719-1729
ANALISA STAKEHOLDER SATISFACTION PADA GUDANG SWALAYAN BERBASIS IMPORTANCE PERFORMANCE ANALYSIS (Studi Kasus: PT. PLN MALANG)
Nur Kasmin Sadhu Wio, Nasir Widha Setyanto, Remba Yanuar Efranto
p1730-1739
PEMILIHAN PRIORITAS PENGERJAAN PROYEK MENGGUNAKAN METODE AHP DAN TOPSIS (STUDI KASUS: CV. CAKRA BUANA KEPANJEN)
Adityawarman Adityawarman, Mochamad Choiri, Ceria Farela Mada Tantrika
p1740-1749
PERUMUSAN STRATEGI PEMASARAN KRIPIK SINGKONG DENGAN PENDEKATAN BAURAN PEMASARAN DAN STRUKTUR PASAR (STUDI KASUS: UD. KEMBANG JAYA LUMAJANG)
Yulita Trirenjani Poerwaningrum, Arif Rahman, Rahmi Yuniarti
p1750-1759
PERENCANAAN PERAWATAN PULVERIZER DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II (Studi Kasus di PT. YTL PAITON)
Mochamad Triatmoko Alih Suryana, Oyong Novareza, Zefry Darmawan
p1760-1771
PERANCANGAN SISTEM INFORMASI BASIS DATA KAPASITAS LINI PRODUKSI (Studi Kasus di PT. HM Sampoerna Tbk., Surabaya)
Septian Lestari Santoso, Purnomo Budi Santoso, Ishardita Pambudi Tama
p1772-1782
Current Issue
Information
For Readers
For Authors
For Librarians
Developed By
Open Journal Systems
Make a Submission
Make a Submission
Browse