Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Jurnal Rekayasa dan Manajemen Sistem Industri
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Team
Privacy Statement
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 5 No. 10 (2017)
Vol. 5 No. 10 (2017)
Published:
2017-08-28
Articles
ANALISIS REDUKSI HAZARD UNTUK KESELAMATAN DAN KESEHATAN KERJA PADA GEDUNG KANTOR PT. ASIMAS DENGAN METODE HIRARC
Elisa Meiyer, Sugiono Sugiono, Ratih Ardia Sari
p2004-2013
ANALISIS GAP POTENSI WISATA PANTAI PELANG BERDASARKAN POTENSI WISATA PANTAI KARANGGONGSO DAN PANTAI PRIGI DI KABUPATEN TRENGGALEK
Syaroh Kurniawati, Remba Yanuar Efranto, Raditya Ardianwiliandri
p2014-2025
PERANCANGAN APLIKASI PENENTUAN HARGA JUAL PRODUK BERDASARKAN METODE JOB ORDER COSTING (Studi Kasus: UD Tohu)
Oscario Yonasta, Purnomo Budi Santoso, Wifqi Azlia
p2026-2036
PENJADWALAN PROYEK PEMBANGUNAN GUDANG DENGAN CCPM BERDASARKAN EVM
Riska Putri Rahmandani, Ceria Farela Mada Tantrika, Ratih Ardia Sari
p2037-2050
PENAMBAHAN JUMLAH BUS SEKOLAH MALANG POOL D DENGAN PENDEKATAN SIMULASI SISTEM DINAMIS
Dyah Kurnia Dhirgo Lestari, Ishardita Pambudi Tama, Agustina Eunike
p2051-2060
ANALISIS RISIKO DAN PENJADWALAN PENYELESAIAN SISA PEKERJAAN PROYEK INSTALASI GENSET 2 MW PLTD ONDONG, SULAWESI UTARA
Yussy Fatma Rosyita, Mochamad Choiri, Rio Prasetyo Lukodono
p2061-2072
ANALISIS UPSTREAM SUPPLY CHAIN KOMODITAS IKAN BANDENG UNTUK MENINGKATKAN KEUNTUNGAN DENGAN SIMULASI SISTEM DINAMIK
Galih Dwi Agung Pramono, Sugiono Sugiono, Agustina Eunike
p2073-2083
ANALISIS HUBUNGAN FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PERAMALAN PERMINTAAN DRIVE CHAIN KIT MENGGUNAKAN REGRESI MULTIVARIABEL
Khairunnisa Khairunnisa, Yeni Sumantri, Agustina Eunike
p2084-2092
ANALISIS BEBAN KERJA SEBAGAI PERTIMBANGAN DALAM MENENTUKAN JUMLAH PEKERJA UNTUK PROYEK REMOTISASI MENGGUNAKAN METODE WORKLOAD ANALYSIS
Sephira Atsila, Ishardita Pambudi Tama, Wifqi Azlia
p2093-2099
PENILAIAN KELAYAKAN TEKNIS DAN FINANSIAL PEMBELIAN MESIN PENGERING KAYU (KILN DRY) DI UD. TOHU SRIJAYA KOTA BATU
Adella Agisthalia, Mochamad Choiri, Wifqi Azlia
p2100-2111
ANALISIS BEBAN KERJA PADA PROSES REWINDING DI DEPARTEMEN WINDING DENGAN METODE WORKLOAD ANALYSIS
Happy Ikmalurrohman Suwarto, Sugiono Sugiono, Rio Prasetyo Lukodono
p2112-2123
ANALISIS DAMPAK LINGKUNGAN PADA PROSES PRODUKSI GULA KRISTAL PUTIH DENGAN PENDEKATAN LIFE CYCLE ASSESSMENT (LCA)
Restu Agung Widodo, Mochamad Choiri, Marudut Sirait
p2124-2135
ANALISIS PENJADWALAN ULANG (RESCHEDULE) PROYEK PEMBANGUNAN GEDUNG PERTANAHAN KABUPATEN X DENGAN METODE RESOURCE LEVELING
Vathrisya Magdalena Simbolon, Mochamad Choiri, Ihwan Hamdala
p2136-2146
ANALISIS POSTUR KERJA OPERATOR PENDORONGAN BEAM DENGAN PENDEKATAN BIOMEKANIKA
Yana Windy Sesha Putri, Remba Yanuar Efranto, Dewi Hardiningtyas
p2147-2156
PENERAPAN CRITICAL CHAIN PROJECT MANAGEMENT PADA PROYEK REHABILITASI STRUKTUR OXY DI PT. BAJA PAMUNGKAS
Nadhilah Hidayah Suryanto, Ceria Farela Mada Tantrika, Rio Prasetyo Lukodono
p2157-2168
PENENTUAN LOKASI GUDANG SPARE PART MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS DI PT.PJB UP BRANTAS
Anisa Atma Putri, Rahmi Yuniarti, Ratih Ardia Sari
p2169-2177
PENGELOLAAN SUKU CADANG MENGGUNAKAN METODE RELIABILITY CENTERED SPARES (RCS) UNTUK BOILER FEED WATER PUMP
Bryan Reyvendra Pradikta, Oyong Novareza, Ihwan Hamdala
p2178-2190
ANALISIS PENGEMBANGAN PRODUK KEMASAN KERIPIK TEMPE DENGAN METODE KANSEI ENGINEERING DAN CULTURAL ERGONOMICS
Novan Bachtiar Setiarsyah, Sugiono Sugiono, Dewi Hardiningtyas
p2191-2202
PENENTUAN SETTING LEVEL OPTIMAL PADA PEMBUATAN BRIKET CAMPURAN LIMBAH DAUN KERING NILAM DAN SEKAM PADI DENGAN METODE TAGUCHI
Mugh Dzin Syah, Nasir Widha Setyanto, Rio Prasetyo Lukodono
p2203-2213
ANALISIS PRODUKTIVITAS DENGAN MODEL OBJECTIVE MATRIX (OMAX) SEBAGAI DASAR EVALUASI KINERJA DEPARTEMEN PRODUKSI DI PT. ESSENTRA
Palmer Alessandro Rumapea, Mochamad Choiri, Angga Akbar Fanani
p2214-2223
Current Issue
Information
For Readers
For Authors
For Librarians
Developed By
Open Journal Systems
Make a Submission
Make a Submission
Browse