PERENCANAAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN BLEACHING DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PERUSAHAAN TEKSTIL

Authors

  • Saptarina Nur Afifatullaili
  • Oyong Novareza
  • Rakhmat Himawan

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui email saptarinanura@gmail.com, novareza15@ub.ac.id, himawan@ub.ac.id

Terima kasih

Published

2016-01-18

Issue

Section

Articles