ANALISIS PENJADWALAN PROYEK MENGGUNAKAN METODE CPM PADA MESIN PASCA PANEN DI PT. SEMERU JAYA

Hendra Adhan Novianto, Arif Rahman, Angga Akbar Fanani

Abstract


Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui email hendrasoekoyo@gmail.com, posku@ub.ac.id, anggafanani@ub.ac.id.

Refbacks

  • There are currently no refbacks.